Finn Hill Junior High - Lake Washington

This was a VA study for a 109,000 SF replacement school that will house 750 students and had sustainability and "future ready" as top criteria in the design. According to the Lake Washington School District,  this was the most successful VA study ever and generated over $4.7 million in alternative proposals at the schematic design level.

 
©2017 Meng Analysis